Polyurethane plastic track and field construction is highly sensitive to environmental conditions such as temperature, rain, snow, frost, and wind. These factors can significantly impact the mixing of materials and the curing process, directly affecting the quality and durability of the final product. Therefore, careful planning and scheduling are essential to ensure a successful outcome.

It is crucial to avoid constructing during the rainy season or in winter, as moisture can compromise the bond between the base layer and the surface. Low temperatures may also hinder the proper curing of the polyurethane, which can reduce the lifespan of the track. When possible, it’s best to schedule work during the warmest part of the day and avoid any construction during windy or rainy weather. If there is frost or fog in the morning, it’s advisable to wait until the sun has fully risen before starting work.
Additionally, if the site is surrounded by trees like poplars or willows, it’s important to avoid construction during their flowering seasons. Falling petals or debris could get trapped in the gaps of the base layer, leading to issues such as loose adhesion or foam formation in the plastic surface. By taking these precautions, you can ensure a smooth, long-lasting, and high-quality track and field installation.
Basic Colors Solid Watercolor
Watercolor Paints Set,Solid Aquarelle Watercolor Paints Set,50 Water Colors Paints Set,128 Colors Watercolor Paint Set
Zhoushan Shenglan Trade Co., Ltd.  , https://www.seamiart.com