Three-level maintenance of equipment management presses

1. Level 1 maintenance, ie daily maintenance system

1 Strictly observe the operating procedures based on the characteristics of the printing press and carefully check the operation of the equipment.

2 According to the regulations, add lubrication oil to each transmission part, especially some hidden oil eyes, etc. to keep the equipment neat, clean, lubricated, and safe.

3 Keep the area around the equipment clean, tidy, free from oil, garbage, etc.

4 The equipment is faulty and eliminated in time, and the handover record is carefully prepared.

2. Secondary maintenance

The maintenance personnel in the equipment division were involved, mainly the workshop operators. To formulate secondary maintenance rules. According to the rules carefully do maintenance work. After the secondary maintenance is completed, maintenance worksheets should be written. Accepted by the main workshop operators. According to the particularity of the newspaper printing industry. Use the May 1st, 11th, Spring Festival holidays and other newspapers to stop the periodicals for secondary maintenance.

3. Three levels of maintenance

Mainly to maintenance personnel. Operators supplemented. According to the third-level maintenance rules, after completing the operation. A three-level maintenance worksheet should be written at the grave. The main personnel of the workshop director and the captain shall check with the main personnel of the equipment department.

The three-level maintenance system focuses on improving operator technology. Strengthen the resources. Manage and use equipment well. It is necessary to regularly check the printing presses, daily inspections, weekly inspections, and half-year inspections to check the safety of printing presses. We must also conduct inspections on personal safety and so on.

1 day inspection: Check it carefully before starting it. If there is no debris. Whether there is damage, rolling off and so on. Proceed with a few laps before starting the machine. See if there are exceptions. Listen, check, and touch when working. Early detection of abnormal conditions in the operation of the machine. It is necessary to cultivate awareness of illness.

2 Weekly Inspections: Half a day is required for inspection and maintenance of the machine to observe if there are any abnormalities and whether the oil circuit is open. The weekly inspections require detailed wiping on the whole machine, and they are asked to find out during the wiping test.

3 half-year inspection: arrange a certain period of time, set the contents of the plan for inspection in advance, generally the entire engine tank to change the lubricant. Parts and electrical appliances are also subject to large inspections. The hidden dangers affecting personal safety should be promptly repaired to ensure personal safety. Strengthen the three-level maintenance of the printing press. Is one of the equipment management, the content, printing companies will benefit from it.

The insulated tumblers were made of double wall stainless steel with superior vacuum performance. It features with a easy drinking lid. It is designed for those who are in need of hot coffee or tea for over 5 hours on the go. Leak proof lid and silicon matt make this tumbler easy to use and safe. We are one of the reliable YETI tumblers suppliers in China. Both 20oz/30oz sizes in different finish are available.

Insulated Tumbler


Insulated Tumbler

Insulated Tumbler,Double Wall Tumbler,Vacuum Insulated Tumbler,Insulated Stainless Steel Tumbler

Zhejiang Haoqi Industry And Trade Co.,Ltd. , http://www.anaturekitchen.com